DOĞAN YILDIZ 5 m3 to 250 m3 LPG STORAGE TANK cisterna de gas nueva

DOĞAN YILDIZ 5 m3 to 250 m3 LPG STORAGE TANK  cisterna de gas nueva
Foto: DOĞAN YILDIZ 5 m3 to 250 m3 LPG STORAGE TANK cisterna de gas nueva
1/17
Comparar Añadido a favoritos PDF
Precio:
negociable
Modelo 5 m3 to 250 m3 LPG STORAGE TANK
Tipo cisterna de gas
Año 2015
Ubicación Turquía Ankara
Fecha de publicación más de 1 mes
Id. de Autoline GT4554
Estado del vehículo
Estado del vehículo nuevo
Descripción
Color blanco
Disponible 19
Información adicional: inglés
115 m3 LPG ABOVE GROUND STORAGE TANK FEATURES
BRAND DOĞAN YILDIZ
TANK TYPE Horizontal Cylindrical
PROJECT CODE AD-MERKBLATTER
DESIGN TEMPERATURE Min -20˚C / max +50˚C
DESIGN PRESURE 17,5 bar
TEST PRESURE 26,5 bar
MATERIAL P355 GH
HEAD TYPE Elliptical
EXTERNAL TANK DIAMETER 3.200 mm
BODY TANK THICKNESS 14 mm
HEAD TANK THICKNESS 16 mm
TOTAL LENGTH OF TANK 15.500 mm
COROSION 1 mm
TANK VOLUME 115 m3
EQUIPMENT TANKS OVER 2” Block Flangeà 2 units àREGO
3” Block Flangeà 3 units àREGO
4" Safety relief Valve 3 units à REGO (MULTIPORT)
Magnetic Level Gauge  1 unit Rochester
1 “ NPT Rotagauge (Rotary Level Indicator) à 1 unit à REGO
Glycerine pressure gauge (0-25 bar), Ø 100 à 1 unit
Thermometer (-30 / 60 ˚ C) Ø100 à 1 unit
Fixed Level Vent Valve (10%-50%-80%) 1 unit à REGO
2” Drain Flange à 1 unit
Manhole 16 “
Blasting and Painting Before painting, the Tank will be sand blasted with SA 2.5 quality undercoat & polyurethane based white topcoat applied providing a total thickness of min. 150 microns.
Control (Inspection and Tests) All tests & inspections mentioned below wiil be carried out under the control of third party & certified by the same authority.
• Checking & approval of design & calculations,
• Material inspection & stamp transferring seperately,
• Visual & dimensional inspection plate orientation,
• Head control,
• Radiographic control,
• Penetrate dye test,
• Hydrostatic test
The reports of the A/M tests & inspections will be presented to the customer together with the inspection certificate of teh tank whicih will be given by the third party after the completion of the tank & the inspections. CONTROL UNION
CERTIFICATION ISO 9001-2008 VE EN 3834-2
WELDING PROCESS All welders are certified according to EN 287-1:2004 standard. Full penetration will be provided in weld seams. Welding will be carried out as submerged arc welding by welders.The Grooves will comply with EN ISO 9692-2. & The Filling Material with EN ISO 14171 & The Flux with EN 760.
HEAT TREATMENT Caps will be treated by heat to relieve the stress.
Esta oferta es de caracter informativo. Para obtener más detalles, póngase en contacto con el vendedor.
Preguntar al vendedor